Ripping ground
In relation to civil engineering, the term ‘ripping’ refers to the loosening of soil, rock or frozen ground by drawing a forked or pronged implement through it.
Ripping (or deep ripping / deep tillage) is also used in agriculture to break up ground for crop planting.
Ripping can be carried out by tractors with rear-mounted rippers or by simple ripper or ‘blade’ attachments for excavators that can provide an alternative to hydraulic breakers.
A 'subsoiler' is similar to a ripper but often with wings on the foot of the tines to increase soil heave and shatter. Ref The HS2 London-West Midlands Environmental Statement, Glossary of terms and list of abbreviations, DETR 2013.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.
Building Safety Newsletter from MHCLG.
An extraordinary record of steel engineering worldwide.
Households living near new pylons to save on bills.
ECA warns growth must not outpace grid capacity or skills.
The role of the client and decision making
CIOB response to built environment professions call for evidence.
Construction's sustainability reporting revolution
Tracking upfront embodied carbon with digital tools.
ECA welcomes procurement reforms
Public spending must back British jobs and skills.
Campaigning for Edinburgh: the Cockburn Association 1875-2049
The role of the civic voice in protecting character. Book review.
CIOB photography competition is open for entries.
ECA Edmundson apprentice of the year award
Finalists announced.
Major new study exposes serious knowledge gaps.

















